Capital and operating expenditures for each of the ten CO2-EOR fields analyzed for the Texas Gulf Coast in $/BBL

Download (0 kB)
dataset
posted on 2013-09-09, 00:00 authored by Carey W King, Gürcan Gülen, Stuart M Cohen, Vanessa Nuñez-Lopez

Table 2.  Capital and operating expenditures for each of the ten CO2-EOR fields analyzed for the Texas Gulf Coast in $/BBL. We assumed that EOR injection and production wells are drilled by side-tracking existing wells, so that capital costs are assumed at 50% of the cost of a new well.

Abstract

This letter compares several bounding cases for understanding the economic viability of capturing large quantities of anthropogenic CO2 from coal-fired power generators within the Electric Reliability Council of Texas electric grid and using it for pure CO2 enhanced oil recovery (EOR) in the onshore coastal region of Texas along the Gulf of Mexico. All captured CO2 in excess of that needed for EOR is sequestered in saline formations at the same geographic locations as the oil reservoirs but at a different depth. We analyze the extraction of oil from the same set of ten reservoirs within 20- and five-year time frames to describe how the scale of the carbon dioxide capture, utilization, and storage (CCUS) network changes to meet the rate of CO2 demand for oil recovery. Our analysis shows that there is a negative system-wide net present value (NPV) for all modeled scenarios. The system comes close to breakeven economics when capturing CO2 from three coal-fired power plants to produce oil via CO2-EOR over 20 years and assuming no CO2 emissions penalty. The NPV drops when we consider a larger network to produce oil more quickly (21 coal-fired generators with CO2 capture to produce 80% of the oil within five years). Upon applying a CO2 emissions penalty of 60$2009/tCO2 to fossil fuel emissions to ensure that coal-fired power plants with CO2 capture remain in baseload operation, the system economics drop significantly. We show near profitability for the cash flow of the EOR operations only; however, this situation requires relatively cheap electricity prices during operation.

History