Mauch, Brandon Apt, Jay M S Carvalho, Pedro Jaramillo, Paulina Dispatchable generation capacity required to cover 95% of day-ahead net load under forecast errors for ERCOT and MISO when load forecasts are in the range 90%–120% of mean load forecast <p><strong>Figure 8.</strong> Dispatchable generation capacity required to cover 95% of day-ahead net load under forecast errors for ERCOT and MISO when load forecasts are in the range 90%–120% of mean load forecast. Each graph shows the 95th percentile of load forecast errors as a horizontal line. Net load forecast uncertainty converges to load forecast uncertainty at zero wind forecast and also at the maximum wind forecast.</p> <p><strong>Abstract</strong></p> <p>Day-ahead load and wind power forecasts provide useful information for operational decision making, but they are imperfect and forecast errors must be offset with operational reserves and balancing of (real time) energy. Procurement of these reserves is of great operational and financial importance in integrating large-scale wind power. We present a probabilistic method to determine net load forecast uncertainty for day-ahead wind and load forecasts. Our analysis uses data from two different electric grids in the US with similar levels of installed wind capacity but with large differences in wind and load forecast accuracy, due to geographic characteristics. We demonstrate that the day-ahead capacity requirements can be computed based on forecasts of wind and load. For 95% day-ahead reliability, this required capacity ranges from 2100 to 5700 MW for ERCOT, and 1900 to 4500 MW for MISO (with 10 GW of installed wind capacity), depending on the wind and load forecast values. We also show that for each MW of additional wind power capacity for ERCOT, 0.16–0.30 MW of dispatchable capacity will be used to compensate for wind uncertainty based on day-ahead forecasts. For MISO (with its more accurate forecasts), the requirement is 0.07–0.13 MW of dispatchable capacity for each MW of additional wind capacity.</p> gw;load forecast accuracy;Net load forecast uncertainty converges;load forecasts;dispatchable capacity;wind power forecasts;load forecast values;ercot;miso;load forecast uncertainty;load forecast errors;forecast errors;mw;wind power capacity;wind forecast;wind capacity;Environmental Science 2013-08-01
    https://iop.figshare.com/articles/figure/_Dispatchable_generation_capacity_required_to_cover_95_of_day_ahead_net_load_under_forecast_errors_f/1011510
10.6084/m9.figshare.1011510.v1